Swann Pinball Project
29Mar/070

Update, Marsh 2007

New resource found for Powersupply-engineering.
Groundworks and initial material will be transfered in the upcoming week.

/Peter

15May/050

Another Week… Work In Progress

The weekly internal report has been distributed.

  • Work in progress on switchmatrix logic PCB-layout.
  • Selection of appropriate DIN-standards for connectors and attachments made.
  • First drafts of final signalingprotocol between systemcomponents presented.

Additional parts order details recieved.

/Peter

9May/050

Another Update!

Standards for electronics design is now finalized and selected. Work is initiated on final circuit layouts for Switchmatrix and Powerdriver electronics based on these. The Switchmatrix prototype hardware will recieve a software update this week with increased communication speed and added requested features.

The first drafts of the Cabinet (top box and main box) has been presented and the audioteam has presented a pre-version of the mainscore audiosequence.

Autocad still in progress. Major rework from the previous "standard" due to several needs in regards to electronics and mechanical design. All Autocad drawings for laneguides are expected to be finished and sent away for manufacture this week.

Previously made parts order items recieved.
The Weekly internal report has been distributed.

All is well!
/Peter